Leven Bridge Engineering were invited to FIMI's production plant in Italy to witness the trial assem...
Read More
Fabrication of an iron runner for Redcar Blast Furnace: fully assembled iron runner complete with ai...
Leven Bridge fabricated a test jig to Tekmar’s specification. The jig was used to simulate a seal ch...
The Multi Purpose Handling System was built for Rockwater, Norway and installed on the ship ‘Subsea ...
This project was to construct previously fabricated pieces of a swing bridge at the riverside. Once ...